Contractor shall provide all labor, commercial grade materials, tools, and equipment necessary to install approximately 272 feet of 8” smooth flow pipe with 8 (each) 16 inch x 16 inch catch basins at the Marksville Readiness Center located at 510 West Waddil Street, Marksville, La. 71351. All measurements in this scope of work are approximate and shall be verified by the contractor. Contractor shall be responsible for providing any lifting capability to complete all new installations and repairs. Site work and demolition. Contractor shall protect all paved surface in location for dumpsters with ¾” plywood as applicable. Contractor shall provide any required selective demolition to complete the installation. The tops of the catch basins shall be installed 3” below the top of the armory’s existing slab. All smooth flow pipe shall be sub-surface to the existing ground. Contractor shall have to reshape the existing aggregate to meet the above requirement and provide a gentle slope from the existing parking lot toward the catch basins. All catch basins shall be linked together using the smooth pipe. This will allow flow for the collected water to drain into the city provided ditch. Please see Attachment D – Drawings for more information. Specifications of material: 8” PVC Smooth flow pipe approximately 272’ 8 Composite Plastic Catch basins 16”x16”