Construction of a sanitary sewer collection system consisting of approximately 4,600 LF of 8-inch gravity sewer, 340 VF of standard and composite polymer concrete manholes, a duplex submersible pump station including 8-foot diameter composite polymer concrete wet well, valve vault, flow meter vault, diesel engine generator, electrical and control panels, concrete site pad and driveway, fencing and related appurtenances, 1,200 LF of 4-inch HDPE force main, 2,000 LF of 8-inch DIP water main, isolation gate valves, fire hydrants, connections to existing water mains, abandonment of an existing water main, asphalt paving restoration, erosion and sedimentation control, and all related appurtenances for a complete and function system.