Specifications include, but are not limited to: This solicitation is for qualifying contractors for (10) VDOT construction projects. Contractors may respond with qualifications for a single project or multiple projects. Contractors should perform no less than 20% of the work with their own organization and not subcontractors. If submitting qualifications for more than one project, contractors should include details on how each project will be staffed and managed if executed concurrently. Chester Area Headquarters Combo Building- The Combination Building is located at 2201 West Hundred Road Chester VA 23831 and is generally described as a single story, approximately 6150 sq. ft. structure with precast architectural concrete masonry exterior walls, pre- engineered wood truss roof framing system, and architectural grade shingle roof system. The facility will accommodate an approximately 1438 sq. ft. administrative office function to include staff offices, meeting room, restrooms, locker room, utility room and storage room. The structure shall also include four vehicle maintenance bays approximately area 4712 sq. ft.. The project shall also include all necessary site and utility work for a complete and operational facility complex. Anticipated work includes all work associated with relocation of overhead electrical lines and grading / earthwork, stormwater management, private septic system, connection to public water service and distribution, paved parking lot, paved / gravel surfacing of lot area, vehicle entrance from road, lot perimeter fencing, automatic entrance gate, propane tank and distribution service, electrical service and distribution, and diesel generator with automatic transfer switch.; Montpelier Area Headquarters Combo Building- The site is located at 16078 Greenwood Church Road Montpelier VA 23192 and is generally described as a single story, approximately 5,470 sq. ft. structure with precast architectural concrete masonry exterior walls, pre- engineered wood truss roof framing system, and architectural grade shingle roof system. The facility will accommodate an approximately 1502 sq. ft. administrative office function to include staff offices, meeting room, restrooms, locker room, utility room and storage room. The structure shall also include four vehicle storage and maintenance bays approximately area 3968 sq. ft.. The Chemical Storage Building is generally described as a single story, approximately 3600 SF salt storage facility with an asphalt mixing containment pad. The project also includes site demolition, site development, utilities, lighting, and power. The Fuel Facility Canopy is generally described as a 24’ x 30’ pre- engineered metal canopy