This Project shall consist of two (2) sections, Section "A" and Section "B". Section "A" Consists of, but is not limited to the following major elements: Construction of approximately 16,160 L.F. of 8-inch DIP, 230 L.F. of Jack and Bore, 434 L.F. of Horizontal Directional Drilling, thirty four (34) each fire hydrant assemblies, nineteen (19) each 8-inch gate valves, and related appurtenances. Section B consists of, but is not limited to the following major elements: Construction of approximately 652 L.F. of Smooth Lined HDPE Storm Piping, Milling of approximately 15,381 S.Y. of existing asphalt, Backfilling GAB in the 15,381 L.F. waterline trench located in the roadway, installing 15,381 S.Y. of 19mm SuperPave asphalt and roadway striping, 443 L.F. of gravel roadway restoration, and related appurtenances.