Specifications include, but are not limited to: A. Disconnect electrical systems in walls, floors, and ceilings to be removed. B. Coordinate utility service outages with Owner if building is to remain occupied during demolition. C. Coordinate utility service outages with utility company. D. Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations. E. Existing Electrical Service: Maintain existing system in service until new system is complete and ready for service. Disable system only to make switchovers and connections. Minimize outage duration. 1. Provide permanent modifications to existing circuits partially demolished in order to maintain continuity of service to existing devices or equipment remaining in operation. Match existing conductor and raceway sizes for extensions, splices,etc required. 2. Obtain written permission from the Owner at least 350 hours before partially or completely disabling system. 3. Make temporary connections to maintain service in areas adjacent to work area