Specifications include, but are not limited to: The Savannah Convention Center seeks bids for the removal of existing asphalt/traffic coating in Bryan Square and the application of new traffic coating. The project encompasses the complete removal of existing materials, surface preparation, repairs, application of new coating, curbing repairs, drain maintenance, and curbing painting. The duration for each phase, potential separate mobilizations, and considerations for facility operations are crucial. The contractor must ensure daily cleanup, site security, and adherence to specified guidelines. As the Convention Center operates continuously, close coordination will mitigate disruptions. • Removal of Existing Coating: - Contractor to remove and dispose of existing asphalt/traffic coating from Bryan Square. • Surface Preparation: -Prep concrete surface for new traffic coating, including repairs identified during removal. -Contractor advised to allocate resources for unforeseen repairs. • Application of New Traffic Coating: - Apply recommended product per specifications and manufacturer guidelines. • Curbing Repair: - Repair any damaged curbing within Bryan Square. • Drain Maintenance: - Ensure drains are clear and functional at project onset and completion. • Curbing Painting: - Paint all curbing with traffic paint upon project completion. • Duration and Mobilization: - Provide complete durations for existing coating removal and new coating installation. -Consider potential pricing differences for separate mobilizations due to facility operations. • Site Management: - Ensure daily cleanup and secure work area. - Remove all materials from the job site upon completion. • Coordination with Convention Center Events: - Work times may vary due to in-house events; closely collaborate to minimize disruptions. • Traffic Control: - Implement and manage all necessary traffic control measures throughout the project.