Specifications include, but are not limited to: Contractor shall deliver Standard Poly Portable Skid Mounted Portable Chemical Toilets or Blackwater Tanks to locations outlined in Section 2 Work Areas below. Contractor shall follow projected installation and removal dates outlined below and as projected in Section 4.1 Production Schedule Table. Note: Portable chemical toilets will be serviced weekly. Portable blackwater tanks will be serviced monthly servicing. All projections are approximate. ODF will communicate with Contractor for verification of mobilization and Service days and Service frequencies for individual Work Areas. 1.3 Contractor Service Requirements • Secure toilets by chaining and locking to Contractor’s provided steel rebar stakes. o Alternate security methods must be preapproved by ODF. • Pump waste from portable vault and wash down interior walls and floor of vault. • Thoroughly clean and disinfect toilet seat, bench urinal and interior walls. • Remove, bag and transport all trash and debris collected from vault and properly dispose of off-site. • Re-charge portable vaults with water and chemical per industry standard. • Re-stock toilet paper only at time of Servicing. • Provide ODF with keys to toilet paper dispensers. • Ensure each portable toilet unit is available for immediate use after pumping and final cleanup. • Sewage Disposal: Contractor must be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, sewage, debris, and trash and payment of all fees. o Sewage Disposal Bond: Contractor must have and be able to demonstrate proof of current valid Sewage Disposal Bond license.