Specifications include, but are not limited to: New flooring and underlayment, stair flooring, bathroom remodel, kitchen cabinets and countertops, electrical and lighting, painting at 16235 Nay Ah Shing Drive, Onamia. Flooring: 1 – Demo and replace flooring and underlayment. 2 – Provide and install new underlayment for the entire floor on the entry level. This includes the entry area, kitchen, dining area, living room, family room. Do not re-use any of the existing. There will be sub-floor repair under the underlayment near entry; General Contractor to provide materials and labor to complete removal and replacement as necessary. 3 - Direct glue down Vinyl Plank Flooring materials in heavy duty commercial quality. Prepare the substrate in a proper and professional manner to accept the direct glue down Vinyl Plank in 12 mill or 30mm thickness. Ensure that there are not imperfections allowing to telegraph through the finished Vinyl Plank floor surface. 4 – Demo all carpet from stairs. Install new vinyl tread and riser covers. Provide and install Johnsonite Service Weight Round Nose (ST) Product for these steps and risers. No substitutions. Include any materials and repairs on the steps and risers to accept the covers. 5 – Demo flooring in the hallway at the top of the stairs. This is the area located outside of the two bedroom areas and upstairs bathroom. Provide and install all new underlayment, direct glue down Vinyl Plank Flooring materials in heavy duty commercial quality. 6 – Prepare the substrate in a proper and professional manner to accept the direct glue down Vinyl Plank. Ensure that there are not imperfections allowing to telegraph through the finished floor surface. Upstairs bathroom work: 7. Demo and replace toilet, flooring, underlayment, base, tub, soffited area above the Tub, vanity / countertops and faucets, sheetrock walls in the entire upstairs bathroom and ceiling area. Remove the entire soffit area. Demo the upstairs bathroom completely back to the wall and ceiling studs. Provide all materials and labor to build back. Prepare for paint. 8. Shower enclosure is Warm Rain model #H530A with Handicap bars and backing factory installed shower enclosure with a built in bench and handicap bars. All building materials and bathroom specialties are either missing or will be removed and replaced in this upstairs bathroom, provided new and replace entire bathroom. Provide and install new plumbing, shower faucets and mixing valve, completely new shower set up with supply and waste piping. 9. Demo and replace bathroom lighting. Provide and install all new bathroom lighting to be appropriate light fixtures including a water resistant fixture and bulb above the new shower, (2) other ceiling lights and a new vanity strip light. Ceiling exhaust fan complete with duct through the roof that includes roof boot and all materials and labor complete with humidistat. See MLBO Spec. Book for Panasonic model #FV-05-11VKSL2. (no substitutions); 10.Provide and install new waste and supply lines for the bathroom complete with venting that meets local and state codes.