Specifications include, but are not limited to: A. Contractor will provide utility locates to discover any underground utilities that could be in the work zones. B. Contractor will pothole, until visible, any marked utility that crosses or is in close proximity to the intended bore path. C. Contractor will excavate a central bore pit, approximately 5 feet by 3 feet by 3 feet in depth, in the B.O.R. land approximately 250 feet east of SW Scott Hill Rd side casting all material. D. Contractor will excavate a receiving pit on the western side of SW Scott Hill Rd. side casting all material. E. Contractor will excavate a receiving pit at the new power pole location along SW Scott Hill Rd., approximately 3 feet by 2 feet by 2 feet in depth side casting all material. F. Contractor will excavate two receiving pits along the western and easter side of the Bobcat Trail Head parking lot entrance side casting all material. G. Contractor will drill west from the SW Scott Hill Rd. pit approximately 450 feet at an approximate depth of 3 feet to the new power pole location. H. Contractor will install approximately 460 feet of 3-inch HPDE electrical conduit. I. Contractor will install a 90 sweep and stub the conduit up out of the ground.