The work to be performed under this Contract generally consists of pavement rehabilitation on 277 street segments in Area 5 and 7 of the City of Downey. This project includes the application of cape seal and type II slurry seal over ARAM, reconstruction of failed pavement areas, cold milling of asphalt pavement, construction of asphalt concrete leveling course, base course, and asphalt rubber hot mix (ARHM) overlay. Work also includes removal and reconstruction of uplifted, damaged, or substandard curb, gutter, cross gutters and spandrels, sidewalk, driveway approach, and curb ramps; adjustments of manhole and utility valve covers to the new grade, replacement of traffic striping, pavement markings, and loop detectors; traffic control and all appurtenant work thereto necessary for the proper construction of the contemplated improvements.