Specifications include, but are not limited to: 1. To purchase a replacement heating water boiler used in the HVAC system of LSU’s AG Chemistry Building. 2. Supplier must provide delivery and offloading to the specified location. The boiler must be placed onto the mechanical room foundation. The dimensions of the room access and foundation are noted below. Any boiler exceeding these dimensions shall be rejected. 3. Manufacturer start up and commissioning support must be provided. 4. All costs associated with delivery, offloading, manufacturer start up and commissioning support must be included in bid response. Boiler Information - The boiler can be a direct replacement or matched with equivalent specs. Current specs of existing boiler are: Burnham Model 3W-175-50-G-1C, Serial number – 20882, Gross Output – 175 HP, 5858 MBH, Max working pressure – 30 psig, Min safety valve capacity – 7000 MBH water.