Specifications include, but are not limited to: TREE REMOVAL AND TRIMMING; INSTALL DRY TAP CONNECTION ON EXISTING FORCE MAIN AND NEW 6-INCH BYPASS CONNECTION ASSEMBLY INCLUDING ALL ASSOCIATED PIPING, FITTINGS, VALVES, CONCRETE THRUST BLOCKS, EXCAVATION, SHORING, DEWATERING EXISTING SANITARY FORCE MAIN, AND TEMPORARY SEWAGE HAULING (SEE EXHIBIT IN APPENDIX C FOR ADDITIONAL INFORMATION); FURNISH AND INSTALL 10-INCH PVC C-900 (DR 18) SANITARY FORCE MAIN SYSTEM VIA JACKING AND BORING WITH 18-INCH STEEL CASING UNDER LELAND AVENUE BRIDGE INCLUDING ASSOCIATED PIPING, FITTINGS, COUPLINGS, EXCAVATION, SHORING, THRUST BLOCKS, RESTORATION, AND DEWATERING; FURNISH AND INSTALL 10-INCH FUSIBLE PVC C-900 (DR 18) SANITARY FORCE MAIN SYSTEM VIA HORIZONTAL DIRECTIONAL DRILLING (HDD) UNDER LELAND AVENUE BRIDGE INCLUDING ASSOCIATED PIPING, FITTINGS, COUPLINGS, EXCAVATION, SHORING, THRUST BLOCKS, RESTORATION, AND DEWATERING; FURNISH AND INSTALL 10-INCH PVC C-900 (DR 18) SANITARY FORCE MAIN SYSTEM INCLUDING ASSOCIATED PIPING, FITTINGS, COUPLINGS, EXCAVATION, SHORING, CONCRETE THRUST BLOCKS, AND DEWATERING (EXCLUDING PORTION UNDER LELAND AVENUE BRIDGE); FURNISH AND INSTALL AIR RELEASE CHAMBER AND CLEANOUT CHAMBERS INCLUDING ASSOCIATED PIPING, FITTINGS, COUPLINGS, VALVES, EXCAVATION, SHORING, THRUST BLOCKS, AND DEWATERING...