Specifications include, but are not limited to: Project Coordination Meetings with the McClung Museum and Haizlip Studio All work must be done during 7 AM - 6 PM EST; advanced coordination with museum staff of all loading dock deliveries is required Preparation of status reports at regular intervals throughout the Project Preparation of Technical Drawings / Shop Drawings for review and approval Field verification of all existing conditions and dimensions Provide existing dimension of walls to receive murals to Exhibit Designer for use in preparing graphic production files Fabrication of all exhibit elements unless otherwise noted Control samples of component color, materials and finish, graphic formats and treatments