Specifications include, but are not limited to: Schedule 1 (base bid) - all Civil, site work , and utilities. Schedule 2 - All foundation work including the slab and all cast in place concrete Schedule 3 - All Precast concrete including all Tower Walls, floor slabs, stairs, catwalk, 1st floor bathroom hardened room . Will also include windows of tower and exit door of the tower to complete the building shell. Schedule 4 - The entire base building: all structural and architectural elements; Schedule 5 - The Control Cab and Roof including lightning protection and antennas; Schedule 6 - All remaining interior work for the Tower including interior walls, finishes, flooring, insulation, doors, drop ceilings, furniture, and casework. Schedule 7 - All MEP including equipment , Telecomm, Fire; Schedule 8 - Demolition of the existing ATCT (the owner will remove any equipment we wish to salvage within 30 days of opening of the new tower)