Schedule 1 (base bid) - all Civil, site work , and utilities. 11 Schedule 2 - All foundation work including the slab and all cast in place concrete 12 Schedule 3 - All Precast concrete including all Tower Walls, floor slabs, stairs, catwalk, 1st floor bathroom 13 hardened room . Will also include windows of tower and exit door of the tower to complete the building shell. 14 Schedule 4 - The entire base building: all structural and architectural elements 15 Schedule 5 - The Control Cab and Roof including lightning protection and antennas 16 Schedule 6 - All remaining interior work for the Tower including interior walls, finishes, flooring, insulation, 17 doors, drop ceilings, furniture, and casework. 18 Schedule 7 - All MEP including equipment , Telecomm, Fire 19 Schedule 8 - Demolition of the existing ATCT (the owner will remove any equipment we wish to salvage 20 within 30 days of opening of the new tower)