Specifications include, but are not limited to: CONTRACTOR'S QUALITY CONTROL PROGRAM (CQCP) 1 LS INSTALLATION AND REMOVAL OF SILT FENCE 3,175 LF INLET PROTECTION 2 EA HEAVY DUTY EROSION CONTROL BLANKET 3,670 SY MOBILIZATION (MAXIMUM 10% OF PROJECT COST) 1 LS PAVEMENT REMOVAL, 10.5" PCC 8,122 SY PAVEMENT REMOVAL, 2.5" AND VARIABLE HMA SURFACE ON 10.5" PCC 296 SY PAVEMENT REMOVAL, 13" PCC 853 SY UNCLASSIFIED EXCAVATION, ON-SITE PLACEMENT 1,391 CY UNCLASSIFIED EXCAVATION, OFF-SITE HAUL 1,629 CY UNCLASSIFIED EXCAVATION, UNDERCUT 302 CY 6" CRUSHED AGGREGATE BASE COURSE 8,574 SY 12" CRUSHED RECYCLED CONCRETE PAVEMENT SUB-BASE 8,574 SY 6" PORTLAND CEMENT CONCRETE PAVEMENT 8,140 SY PCC LONGITUDINAL CRACK ROUT AND SEAL 300 LF AIRFIELD PAVEMENT MARKING, WHITE, REFLECTIVE 915 SF AIRFIELD PAVEMENT MARKING, YELLOW, REFLECTIVE 2,540 SF AIRFIELD PAVEMENT MARKING, BLACK, NON-REFLECTIVE 4,165 SF AIRFIELD PREFORMED THERMOPLASTIC MARKING - SURFACE PAINTED HOLD SIGNS (INSTALLATION) 185 SF AIRFIELD PREFORMED THERMOPLASTIC MARKING - SURFACE PAINTED HOLD SIGNS (MATERIAL) 185 SF AIRFIELD PAVEMENT MARKING REMOVAL, ON PCC 3,020 SF AIRFIELD PAVEMENT MARKING REMOVAL, ON HMA 125 SF AIRFIELD TEMPORARY PAVEMENT MARKING, REFLECTIVE 1,000 SF