Specifications include, but are not limited to: 1) Set 3 new manholes to City standards a. 1 doghouse manhole (5.87’ Rim to FL) b. 2 standard manholes (4.01’ Rim to FL, 4.02 Rim to FL) 2) Lay approximately 98 LF of 8” sanitary sewer line (SDR 35 min standard) to City standards a. Open cut (if chosen) i. to include tree removal as necessary ii. to include fence removal and replacement as necessary b. Bored in place (if chosen) i. directional bore 3) Relay and reconnect 2 service lines a. Cleanouts installed at any horizontal bends 4) Restoration of any fences, sidewalk, or sod disturbed during construction 5) Removal of existing manhole top section and abandon in place with line plugged, bottom section filled with compacted soil. No part of abandoned manhole should be within 2’ of the finished grade. 6) The construction company will be responsible to identify all utility locations and determine if there is a utility conflict prior to start of construction.