Specifications include, but are not limited to: Grind, Sawcut, and remove to a depth of eight (8”) of asphalt and subgrade, twelve (12’) wide for a total of approx..12,000 Sq ft of damaged and cracked asphalt. This includes Three (3) fifty (50’) ft long by twelve (12’) ft wide asphalt ramps that lead down to the beach. Remove and provide dumpster or dump vehicle to haul away Grind, Asphalt debris. Grade and Compact base (four inches). Repave four inches (4) of Hot asphalt walkway and ramps. Stencil No Bikes every twenty feet with white paint. 4”-5” lettering NO BIKES using water based acrylic traffic paint. Fencing with Fabric is required along one side of the entire length of the walkway between the first row of vehicle parking lot to catch and control any foreign matter while grinding and to keep the public out of the construction zone. Best management practice to keep dust, debris, asphalt, and foreign matter from entering areas outside construction areas. Fencing to be placed along the side of the parking lot and walkway.