Specifications include, but are not limited to: The work will consist of pipeline and overlay construction in 2 areas of Oak Harbor as follows: SW 4th Avenue Water Main Replacement and Overlay. Work includes the installation of approximately 875 linear feet of 8-inch PVC water pipe, 75 linear feet of 6-inch PVC water pipe, and approximately 150 linear feet of 4-inch PVC water pipe. This work also includes the installation of four 8-inch gate valves, one 4-inch gate valve, 17 service connections, two fire hydrant assemblies, and four bollards. NE Regatta Drive Water Main Replacement and Overlay. Work includes the installation of approximately 1,550 linear feet of 8-inch PVC water pipe and approximately 50 linear feet of 6-inch PVC water pipe. This work also includes six 8-inch gate valves, 11 service connections, and three fire hydrant assemblies. All work shall be in conformance with the Contract Plans, Contract Provisions, and the 2023 Standard Specifications for Road, Bridge and Municipal Construction.