Specifications include, but are not limited to: supply, delivery and installation of 12” SDR Pipe to replace the failed 12’ VCP sewer main. This project will probably need to have a temporary bypass set up to divert the flow while the tie in is being completed. City staff have recently contracted to have CCTV of the failed sewer. That footage can be reviewed by at the request of the Bidder. The full width of the section of Maple Street disturbed is to be repaved by the successful bidder. City Standards call for a minimum of 6” of compacted MDOT 22A gravel on an approved subbase. The pavement thickness shall be a minimum of 3 inches of bituminous mixture per City Standards. The work shall include replacement of any removed asphalt wedge curb edge. The City may require the successful bidder remove and replace additional lengths of adjacent sections of the street at the proposed unit price.