Specifications include, but are not limited to: 1. Level 2 Electric Vehicle (EV) Charging Stations (Stand Alone Mount) Work shall include, but not be limited to, level 2 dual port charging stations, bollards per detail A/E001, concrete pedestals per detail B/S001, pedestal mounting per detail A/E303, in accordance with the drawings and specifications. 2 EA; 2. Stationary Bollards. Work shall include, but not limited to, installing bollards per detail A/E001, and in accordance with the drawings and specifications. 4 EA; 3. Duct Section Type “P”. Work shall consist of excavation/backfill, concrete encasement, conduit, spacers, couplings, restoration, and other accessories as required, complete and in place 235 LF; 4. Duct Section Type “U”. Work shall consist of excavation/backfill, concrete encasement, conduit, spacers, couplings, restoration, and other accessories as required, complete and in place 40 LF; 5. Duct Section Type “M”. Work shall consist of excavation/backfill, concrete encasement, conduit, spacers, couplings, restoration, and other accessories as required, complete and in place 80 LF...