Specifications include, but are not limited to: All concrete will have design mix for 3500psi compressive strength and shall have an air-entraining admixture to give air content between 5 to 7% volume concrete. A .006 mil polyethylene plastic. Plastic shall be installed as a waterproof membrane and all plumbing penetrations in the plastic must be taped tightly. FRONT PORCH POURED LEVEL WITH THE FLOOR AND ADA THRESHOLDS ON EXTERIOR DOORS. Footing: Shall be 18”x18” minimum with 5/8” rebar using four bars with 1” R-Board (Foam beaded will not be accepted) (Must conform to the requirements of the local building code as adopted by the city in which the work takes place IF APPLICABLE) and city/state building codes. PARKING PAD: 14’x20’ concrete driveway approach includes sidewalk connecting approach to front porch. Sidewalk minimum 30ft. A Drop down will be required for the garage entry. Must comply with local/state code. Porches: Build per plans- All work must meet the requirements of city/state codes (if applicable) Porches must be poured at the same time as the floor to create monolithic pour. Post Tension Cables will be required with approved concrete blueprints, unless contractor supplies a soil sample test. APPROVED CONCRETE BLUEPRINTS MUST BE SIGNED OFF BY HACN, CONSTRUCTION MANAGER PRIOR TO BEGINNING PROJECT. Concrete Cylinder: Contractor will take (3) test cylinder per truck (1) for a 7-day break and (2) for a 28-day break Test results for slab and footing. All test results shall be sent to the office. Attn: Inspector Supervisor and/or Construction Manager. 1 per truck, each footing requires a 28-day break, and each slab requires a 7 and a 28- day break...