Specifications include, but are not limited to: This project includes installing new UV reactors in abandoned traveling bridge sand filter basins. Work will include demolition of the abandoned traveling bridge sand filter basins, basin modifications, installation of two non-contact UV systems, electrical modifications, programming of the new system, and removal of the existing UV system. As a part of design phase services the CMAR may be required to do the following: Provide design assistance and services necessary to finalize the design to a point where the CMAR can provide a GMP for various project phases of the work. Identify any and all permits necessary to commence and finish the construction work and assign responsibility to the concerned parties for obtaining the respective permits, and document City and CMAR agreed assignment for obtaining such permits; Review the 90% design submittal by the design professional and provide comments regarding sustainability, required clarifications, and measures to reduce costs; Provide alternate systems evaluation and constructability studies; Provide a comprehensive constructability and value engineering review with ranged construction cost estimate for the 90% design submittal; Recommend construction phasing of the project for GMP purposes based on each design submittal; Provide a construction cost estimate for each design submittal; Address high standards for quality and safety and protection of the environment; Attend submittal review meetings; Participate in other project meetings with the City or the design professional to include at least one City Council meeting, if requested by the City