Specifications include, but are not limited to: 1) Design, supply, and install 2- primary power conduits per RI Energy Company. Specs from the new utility pole on the south side of the Public Works exit driveway to the new utility transformer pad lower on hill toward Pulchaski Field, primary conduits to be concrete encased. 2) Design, supply, build, and install 1- prefab concrete transformer pad with grounding grid per RI Energy CO. a) Specs, new pole and transformer by utility company. 3) Design, supply, build, and install 1- 400 amp, 3-phase secondary service lateral from new transformer pad to new power stanchion location downhill on field level with 2- 3" PVC conduits and aluminum conductors. 4) Design, supply, build, and install 1- 400 amp, 3 phase meter socket with new 400 amp main circuit breaker, 3 phase, 30 ckt, nema 3r enclosure panelboard mounted to new pressure-treated power stanchion provided by others, panelboard to be used for power to concession stand, scoreboard and field illumination on the west side of the field. 5) Design, supply, build, and install grounding electrode system per code for new power stanchion equipment.