Specifications include, but are not limited to: This project shall be turnkey. This includes the removal and disposal of the existing unit, labor, materials, and lifts (if necessary) to replace units at the locations. The Contractor(s) will perform all required administration, management, and quality assurance to ensure proper installation of the unit. All work performed shall be under the direction of the Director of Maintenance and Energy or his designee. Due to certain locations within the District, employees must have the ability to pass a background check and to work unsupervised. The Contractor may be required to provide a background check as requested by the district.; The Contractor shall ensure all trash, garbage, spent material containers, etc., are picked up on a daily basis. The Contractor shall restore the site to a condition equal to that in which it was found. In the event the site is not cleaned and/or the final restoration not performed, the District reserves the right to have the site restored and with the costs being charged to the Contractor.