This Scope of Work (SOW) outlines the construction responsibilities and coordination requirements for the Contractor engaged in the construction of the New C Section Garage, which is part of the larger Terminal C Program at the Airport. The SOW addresses the demolition of the existing garage, construction of a new garage, associated roadways, and utility work, as well as coordination with ongoing airport projects and stakeholders as outlined in the Contract documents. The Contractor is responsible for reviewing all existing conditions prior to the commencement of the Work. SOW includes, but is not limited to: 1. Garage Construction: a. Demolition: Remove the existing Garage C on the south side of Terminal C, ensuring all utilities are appropriately capped. b. New Construction: Erect a new 6-level Bubble Slab concrete post-tension structure within the same footprint, including: − Flat decks with necessary sloping for drainage. − A two-way speed ramp at the north end. − Two-way drive lanes with 9’x18’ parking spaces. − Structural bays measuring 30’ x 60’, designed to support an additional level plus a roof structure with a solar system. − Two elevator/stair cores, each with dual elevators featuring an architectural metal panel finish and equipped with heat detectors, recall to LV 1, alternate LV recall, and a fire indicator. − A Parking Guidance System (PGS) on all levels.