The proposed work includes a combination of street and utility work in five separate locations in the City of Bozeman: Location 1: Reconstruction of Bogert Place from East Story Street to South Church Avenue including: replacement of existing water mains, valves, fittings and appurtenances, sewer mains and manholes, and storm drainage pipe, inlets and manholes; removing the existing road section from curb to curb and constructing a new road section, new signage, sidewalks, adjusting existing utilities to accommodate the new roadway, restoring boulevards to pre-existing conditions and all related work incidental to construction. Location 2: Stormwater Improvements on South Tracy Ave. from Babcock to Main Street, consisting of replacement of approximately 560 lineal feet of existing 12-inch diameter (nominal) vitrified clay pipe with 18-inch diameter PVC pipe. The stormwater main is located within South Tracy Street from its intersection with Babcock, north to the alleyway north of Main Street. Completion of this work will include the replacement of stormwater manholes/inlets, service lines, connections to existing stormwater system, surface restoration, and traffic control. All work will be completed within existing City of Bozeman Road right-of-way and MDT right-of-way. Location 3: Replacement of existing water mains consisting of 6” asbestos concrete pipe located within South 12th, 13th, and 14th Avenues between West College Street and West Koch Street. These mains are to be replaced with approximately 4573 linear feet of 8” ductile iron water main and appurtenances. Location 4: Replacement of existing sewer and storm mains located in South Black Avenue between College Street and Main Street and replacement of water and sewer mains in Dickerson Street from South Black Avenue east to near Bozeman Avenue. The work includes approximately 3,187 linear feet of sewer main replacement, 902 linear feet of storm drain replacement and 261 linear feet of water main replacement. Location 5: Replacement of existing sewer and water mains located in North 8th Avenue between Mendenhall Street and Beall Street. The work includes approximately 570 linear feet of sewer main and 307 linear feet of water main.