Consultant shall use the 2021 single track design study recommendations to assemble final design plans. The final plans and other necessary bid documents shall be provided to the County in early November of 2024 to ensure the bid documents can be advertised by November 22, 2024. • Consultant shall perform a site visit with the County to reevaluate the trail alignments that were given in the 2021 design study, specifically areas where ash tree removal has occurred and areas where the single track trail crosses existing trail systems within the park. • Consultant shall provide all necessary signage recommendations and locations on the plans for the single track trail. • Consultant shall provide gate recommendations and locations on the plans for the single track trail. • Consultant shall provide the County with GIS shapefiles of each trail layout. • Trails shall be designed in conformance with the design best practices and standards established by the International Mountain Bicycling Association to avoid problems with soil erosion and minimize impacts on vegetation and natural resources.