A. All stone shall conform to current VDOT Material Specifications. Materials must be supplied from a VDOT pre-approved plant. Plant must have been approved prior to award of contract. B. The Contractor shall furnish #21B stone, and deliver and spread stone on the State force construction projects in Wythe County listed below: 1. Approximately 1,300 tons – Route 731 – Doe Run, Wythe County, VA, UPC #0000118325. Coordinates: 36.911296° -80.907005°. From the Intersection of I-81 (Exit 80) and Route 52 South (Ft. Chiswell Road), turn right onto Route 52 South. Travel approximately 3.9 miles to Route 627, turn left onto Route 627 and travel approximately 0.4 miles, turn right onto Route 698 (Rome Road), travel approximately 0.5 miles to Route 731 (Doe Run) project site. Project length: 0.46 miles. 2. Approximately 3,700 tons – Route 600 – St. Lukes Road, Wythe County, VA, UPC 0000113584. Coordinates: 37.009909° -81.093973°. From intersection of I-81 (Exit 70) and Route 52 North, travel on Route 52 North for approximately 0.2 miles, turn right onto Fairview Road, travel approximately 3.2 miles, turn right onto Route 600 (St. Lukes Road), and proceed to project site. Project Length: 1.32 miles. C. Minimum daily delivery shall be 250 tons for each project location. D. VDOT will give the Contractor at least 24 hours notice prior to the required delivery date and time.