Specifications include, but are not limited to: Project consists of the supply and installation of a 50’ x 60’ insulated steel building at the MCA South Campus located at Montgomery, WV. Installation notes are as follows for the BASE BID: Concrete Pad Requirements: 1. Excavate existing 50’x60’ area in location outlined in attachments. 2. Provide and install 50’x 60’ steel reinforced turndown concrete pad. (Rebar layout attached) See Exhibit E attached. 3. Pad concrete thickness shall be a minimum of 6” in thickness of 4500psi concrete with 2” of Class 2 aggregate base. (Rebar reinforcement layout attached) See Exhibit E attached. 4. Provide stub-ups in slab for all utilities. (water, sewer, electrical and gas) 5. Provide a 16’ x 50’ (field verify) steel reinforced concrete driveway from access road to building following the same specifications for building pad. 6. Provide a 4’ wide, steel reinforced concrete sidewalk from single door entrance of building to existing sidewalk. 7. The sidewalk shall have a minimum of 4” in thickness of 4500psi concrete with 2” of Class 2 aggregate base. 8. Dispose of all construction debris offsite. 9. Repair any disturbed areas. Steel Building Requirements: 1. Provide and install a 50’ x 60’ x 14’H prefabricated insulated steel building with gable style roof on new concrete pad. 2. Stamped drawings from building manufacturer shall be provided prior to construction. 3. Provide a 10’ x 10’ overhead coiling door w/ motorized opener at driveway. 4. Provide 2 – 36”x 80” man doors. One shall be located at sidewalk and the other to left side of 10’ x 10’ garage door entrance. Electrical Requirements: 1. Provide and install meter base, switchgear and 42 slot distribution panel for new 208/270 three phase, 400amp service. 2. Provide and install surface mounted conduit for lighting and electrical outlets throughout. 3. Provide and install LED high bay lighting fixtures, evenly spaced throughout building. 4. Lumen testing shall be performed to determine adequate lighting of space. 5. Provide and install 120V electrical receptacles evenly spaced throughout building. 6. All new work shall be installed in accordance with the latest version of the National Electric Code. HVAC Requirements: 1. Provide and install a concrete pad mounted 8-ton Rheem RGEDZT Commercial Classic Series packaged gas electric unit divided into two stages with a natural gas fired heating section, or equal. (install location TBD) See Exhibit F attached for detailed specifications. 2. Provide and install switchgear and electrical connections for unit. 3. Package unit shall be three phase and have a new circuit pulled from the nearest service entrance. 4. All new work shall be installed in accordance with the latest version of the National Electric Code. 5. Provide and install piping for gas connections to unit. 6. Natural gas piping shall be sized and installed per the latest version of the Natural Fuel and Gas Code. 7. Provide and install all supply and return insulated ductwork. 8. External supply and return ductwork shall be metal with internal insulation and sealed weathertight. 9. Supply duct shall extend into the building and transition to fabric duct with internal hoop system or equivalent and run the length of the building. 10. Return duct shall stop once it has entered the building and have a grill to cover the opening...