Specifications include, but are not limited to: 01 Site Preparation: 1. Provide temporary toilet facilities from job start until approval of permanent facilities. 2. After procuring all required permits, place a 30 cubic yard, roll-off dumpster without damaging the site. Collect construction debris using dust control methods. Acquire a sufficient number of dumpsters in order to hold the materials removed during demolition. 02 Windows/Doors: 1. Install a pre-hung solid wood, 6-panel entrance door with sidelights to fit existing opening and jamb including interior and exterior casing, spring metal weather-stripping, interlocking threshold, one entrance and one mortised deadbolt keyed alike. Prime and top coat. Install all base and wall cabinets securely to the stud framing of the walls. 2. Field measure, order and install a wood, single hung, double glazed, one-over-one window and jamb including screen, caulk, interior casing and exterior trim. Install half screen. 03 Plumbing 1. Install a 5ft Sterling 4-piece, fiberglass tub and shower unit complete with lever operated pop-up drain and overflow, PVC waste, single lever shower diverter, shower rod and Delta 6122 water saving shower head.