Specifications include, but are not limited to: 1. Mobilization LS 1 2. Temporary Removal of any existing equipment, bleachers, doors and relocate them back at the original location after the flooring completion LS 1 3. Removal and disposal of the existing flooring and/or any unclassified debris, any unused material beneath the flooring at the gym SF 8510 4. Remediation of any existing damages and/or depression due to imperfections in the substrate floor flatness and/or the leveling LS 1 5. Relocate the pole sleeves as per the project specifications and special provisions EA 12 6. Relocate all the existing power plugs/sockets to the same as the original. LS 1 7. Furnish and install a new fixed resilient, First-grade maple wood gym floor including the skirting. SF 8510 8. Painting the new gym floor, marking layout and dimensions to be same as the original marking and painting (basketball court striping, volleyball striping, Pickleball striping etc.). LS 1 9. Design and Installation of Parks and Water Bond Act of 2018 (Proposition 68) Sign LS 1