Specifications include, but are not limited to: This is the Phase 2 solicitation for vendors found qualified through QLV24003768. Properly remove and dispose of sunken barge and crane in Providence River to the complete satisfaction of RIDEM. The qualified contractor will remove the Sunken Barge using equipment to access the items from the water. The contractor will provide all equipment and staff necessary to secure all required Federal and State permits and effectively remove and properly dispose of the Sunken Barge and associated debris from the area. There are 4 methods of removal that are acceptable for this project, and the contractor must choose one or a combination of these methods: 1. Float the crane and barge. 2. Lift the crane and barge. 3. Use divers to cut the crane and barge into pieces and lift the pieces onto a barge. 4. Guillotine the crane and barge.