Specifications include, but are not limited to: This job has multiple roof leaks. Recommend going on the inside of the home in determining the scope of work. This may need re-sheathed, very possibly some roof reconstructing due to excessive water damage. Remove the chimney below the roof line. Frame in the existing opening and install sheathing over the roof framing to meet the existing roof plane. Must install a chimney liner for the waterheater. Installation must align with 2015 IMC , have a rain collar around the liner, and rain cap that must be fasten with screws. Ice and snow guard in all the valleys and lower edges of the roof line. This must cover 2’ higher than the exterior plate line. Approved water barrier over the remain roof sheathing. Install new 2’ style D roof edging throughout. Install 35-year architectural shingles of the homeowner’s choice. Install a shingle over ridge vent following manufacture’s instruction. Allow maximum cut back of the ridge line for ventilation. The is a small section of flat roof that will need rolled roofing membrane. Install all head flashing and new step flashing at the wall lines. Permit is required before work begins.