Specifications include, but are not limited to: 1. Remove existing Bedroom 1 sashes out of the window. This unit is a twin. Dispose sashes and window components of old window in proper waste disposal containment. Install new replacement double hung. Windows need to be minimum of ½ “smaller than the RO for proper shimming. Push new unit back tight to inside existing mill work. Level, square, and spray nonexpanding window and door foam around all four sides. Install stop’ s and cap all exterior trim with aluminum break metal (white coil stock). Caulk with 25 yr. Quad white, where all the surfaces intersect making 90* corners. Such as coil to jay channel and coil to window frame. Side A-1; 2. Remove existing Bedroom 2 sashes out of the window. This unit is a triple. Dispose sashes and window components of old window in proper waste disposal containment. Install new replacement double hung. Windows need to be minimum of ½ “smaller than the RO for proper shimming. Push new unit back tight to inside existing mill work. Level, square, and spray nonexpanding window and door foam around all four sides. Install stop’ s and cap all exterior trim with aluminum break metal (white coil stock). Caulk with 25 yr. Quad white, where all the surfaces intersect making 90* corners. Such as coil to jay channel and coil to window frame. Side B-1; 3. Remove existing 2 nd Floor Stair Well/Sitting area sashes out of the triple window. Dispose sashes and window components of old window in proper waste disposal containment. Install new replacement double hung. Windows need to be minimum of ½ “smaller than the RO for proper shimming. Push new unit back tight to inside existing mill work. Level, square, and spray nonexpanding window and door foam around all four sides. Install stop’ s and cap all exterior trim with aluminum break metal (white coil stock). Caulk with 25 yr. Quad white, where all the surfaces intersect making 90* corners. Such as coil to jay channel and coil to window frame. Side C-1...