Specifications include, but are not limited to: THE VCT FLOOR TILE AND BASE BOARDS IN THE 2ND GRADE BUILDING AT LEAKE CENTRAL ELEMENTARY IS TO BE COMPLETELYREMOVED IN ALL HALLWAYS, CLASSROOMS, AND CLOSETS; (BID IS TO BE ITEMIZED BY HALLWAY/ CLASSROOMS & CLOSETS); THERE IS 8600 SF OF TILE IN THIS PROJECT; THE FLOOR IS TO BE LEVELED, CLEANED, AND PREPPED; NEW VCT TILE AND BASE BOARD OF THE DISTRICTS CHOICE IS TO BE INSTALLED AND WAXED WITH 5 COATS OF QUALITY WAS WITH A MINUMUM OF 25% SOLIDS; ALL FURNITURE WILL BE MOVED BY THE SCHOOL DISTRICT; ALL WORK IS TO BE CONDUCTED IN A SAFE CHILD FRIENDLY MANNER THAT FOLLOWS ALL FEDERAL, STATE, AND LOCAL LAWS AND REQUIREMENTS; ALL WORK IS TO BE SCHEDULED WITH THE DAY TO DAY OPERATIONS OF THE SCHOOL DISTRICT; THE CONTRACTOR IS TO PROVIDE A CONTAINER FOR ALL DEBRIS, OLD TILE, AND TRASH RELATED TO THE PROJECT