o Item 1.1: Double Steamer Qty: One (1) Each o Shall be a pressure less, natural gas, 2 compartment steamer with individual generators, (5) 12x20x2-1/2 pans/compartment capacity, Sure Cook controls, 60-minute mechanical timer & manual (continuous steaming) bypass switch, left-hand hinged door, controls on right, 1 standard treated & tap water connection, auto fill and drain, stainless steel construction, 6” adjustable legs with flanged feet, 144,000 BTU total. Cleveland SteamCraft Gemini 10 Model No. 24-CGA-10.2 or equal. o Slamable, Two-Piece Compartment door o Standard 1-year parts and labor warranty with additional 1-year warranty on water related parts upon completion of scheduled free manufacturer startup o 5-year pro-rated parts warranty on steam generator o 2 ea. -3-year Convection steamer door warrantees o Water Treatment System, dual cartridge Catalytic Carbon Filter & activated carbon filter, reduces chloramines, scale, chlorine & sediment, WBT-QTI1-CR Optipure Water Treatment System or equal. o 1 ea. CTOS-QCR and 1 ea. CTOS-Q10 replacement filters o 1 ea. Natural Gas Quick Disconnect o Item 1.2: Manufacturer Turnkey Installation Qty: One (1) Each o Receive NEW unit, uncrate, peel all interior and external protective plastic. o Disconnect and remove existing unit and set outside of building for BISD maintenance disposal. o Deliver NEW unit to campus, set in place, level, and route drain lines o Connect natural gas service with new quick connect gas hoses via a 1/2 NPT gas supply line. o Connect 3/4” NH cold water supply line connection. Install new factory approved water filtration system. o Connect and route drain connection to existing building utilities. o Connect single 120 Volt/60/1-ph electrical service to existing building utilities (Do not Connect to GFI outlet) Successful Bidding Kitchen Equipment Contractor (KEC): o A representative of the successful bidding dealer, in conjunction with the Manufacturer’s Rep, is to coordinate with Bryan ISD new product training for the new steamer.