Specifications include, but are not limited to: Red Clay Consolidated School District is planning to utilize ERATE Category II funding to run a 12-strand aqua 50 micron OM4 multimode fiber as per State of Delaware technology and architecture standards from the MDF of Skyline Middle to the MDF of Heritage Elementary. New fiber line will have to be buried in the ground in conduit between the two schools. The district would also like to have a second spare conduit installed for future use. Vendor to determine best path between the schools as well as the best path inside of the schools to connect the MDF closets to each other. Vendor is responsible for installation, termination, testing and documentation of all cabling.