Specifications include, but are not limited to: The Project includes backfilling and grading of existing farm pond with onsite material within the Village of Chestnut Ridgecommunity in order to re-establish over one acre of wetlands within the Murderkill River Watershed. Work also includes: retrofitting existing stormwater pond to a dry pond with bio-swale detention areas modification of existing stormwater outlet structure installation of riprap within existing forebays selective concrete demolition installation of two gabion and riprap reinforced spillways extensive soil bioengineering consisting of live stake branching, coir logs, and fascine bundles. Project to include planting of wetland and riparian seed mixes along with several hundred trees and shrub