The International Boulevard at Tanger Outlet Boulevard Right Turn Lane project, located in the City of North Charleston, involves the construction of a right turn lane on International Blvd onto Tanger Outlet Blvd. The work shall include, but is not limited to, earthwork, asphalt and concrete paving removal, asphalt paving, concrete curb and gutter, installation of concrete sidewalk, removal and installation of a traffic signal mast arm, installation of traffic signaling & updates, removal and installation of crosswalk with stamped pattern, 88 feet of 18” Smooth Wall pipe (HDP or RCP), 8 feet of 24” Smooth Wall pipe (HDP or RCP); 1 each of: Type 16 catch basin, junction box, and a 24”x36” drop inlet; as well as pavement markings, traffic control, signage, and erosion control. The project will be constructed utilizing the items listed on the bid tab form in the solicitation.