Remove the existing two vault doors in the Rehoboth Armory (13 Fire Tower Rd. Rehoboth MA) and replace both with new vault doors and frame that are compatible with the existing opening and GSA approved in accordance with Federal Specification FF-L-2937. Remove the existing two vault doors in the Quincy Armory (994 Hancock St. Quincy, MA) and replace both with new vault doors and frame that are compatible with the existing opening and GSA approved in accordance with Federal Specification FF-L-2937 (attached). The contractor shall be responsible for the removal and disposal of the existing vault doors and frames as necessary in accordance with MAARNG Environmental program. Vendor shall be responsible for any/all retrofit and re-engineering of local structure at existing door frames and partitions as required by new vault doors specifications. Vendor shall work in line with Electronic Security System (ESS) Manager to ensure intrusion detection system (IDS) is operational. The vault doors shall be classified as a 5-B vault in accordance with AA-D-600D (attached). The vault doors shall be installed in a phased manner and a schedule will be provided to the POC outlined below. The contractor’s proposal shall include the delivery of the material, off-loading, and movement into the facility.