The work on the locations indicated on the attached maps generally includes, but is not limited to; sweeping; application of micro surface asphalt binder and crack seal binder per UDOT specifications (UDOT Special Provision Section 02735S). A Type II microsurface treatment will be placed in the cul-de-sac areas and a Type III microsurface treatment will be placed on all other areas as outlined on the maps; rolling joints as needed (per city engineer); crack blowing/cleaning; crack sealing (including along lip of curb), cleaning roadway surface of anything that will keep the micro surface form bonding properly including thermos plastic or other dirt and grim, replace existing pavement marking paint as is in place or as outlined in striping plans and any other materials, transport, and labor necessary to complete job based on construction plans and UDOT Standards.