The work comprises the furnishing of all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder at the intersection of Harbor Boulevard and Arbolita Drive in the City of La Habra and shall consist of but not be limited to Mobilization, Water Pollution Control, BMPs, Traffic Control, Safety, and Cleanup, Construction Staking and Monument Perpetuation, PCC Curb and Gutter Reconstruction, Sidewalk Removal and Replacement, Roadway Excavation, Curb Ramps, Signing and Striping, and Pedestrian Push Button Relocation which includes all incidental work so indicated on the plans, specifications and tables, and required for the proposed improvements.