Specifications include, but are not limited to: * Contractors are required to remove any obstacle that are obstructing the Roof, Soffit And Gabbles. * Remove all clay roof tiles and replace with roofing shingles and pebbles paper, and install TPO on roof . * Contractor must remove all complete roofing system material consisting of roof vents, pipe flashings, and replace it with the same or equal venting system approve by the City of Laredo building codes and paint with approval galvanized metal paint. * The contractor must replace all existing cedar facia and sub facia and paint them with semi-gloss exterior white wood paint. * All Pipe flashing must be replaced with lead flashing and paint them with the color approved by LFD. * If plywood are found to be rotten and needs to be changed, contractor will replace with 5/8 Cdx plywood. * Contractor must inspect and remove any rotten or damaged rafters of the property with 2x8 or same material as on site and Eave Strip System. * Shingles 25 Years, 3 Tab Owens corning red shingles. * The Contractor must remove all the under-eave soffit system and install new under-eave soffit installing new 3/8 rough soffit and 8x16 aluminum vents every 8ft. * Include materials, labor, tools, supervision, and all necessary to complete this project.