Specifications include, but are not limited to: Charges for repair service for all work performed will be at a fixed hourly dollar amount based upon 160 hours of repair service for each year of the contract. The fixed hourly rate price will be included in the bid. The contractor shall lubricate, adjust, repair or replace if necessary, machine, motors, pump units, controller, selector device, door operator, door sheaves and hangers, rail guides, deflector sheaves, governor and fixtures as deemed necessary. Clean machine room equipment and machine room floor where used exclusively for the elevator equipment. To provide the necessary lubricants (including hydro oil) and wiping material to properly perform the above service. To provide twenty-four (24) hour emergency service seven (7) days a week, at no extra charge. The contractor will be responsible for scheduling and attending annual tests of equipment. The contractor’s annual maintenance cost must include for all related State and local permit and inspection fees on all elevators and all related State and local permit and inspection fees on all wheelchair lifts. The contractor is responsible to complete the State of MASS, Pre Inspection Check List – Annual Inspections for Elevators/Wheelchair Lifts. Pre-Inspection Checklist must be certified that the unit has been pre-tested prior to periodic inspection and available on site/in machine room at the time of Inspection 524 CMR 5.03 (8) (11) The Contractor shall provide the Director of Parking with a written report with costs, to cover any deficiencies as a result of annual or 5-year test on the units. This shall be provided within 7 days following the testing of the units. If there is a delay in the issuance of a certificate for any elevator from the Department of Public Safety, a letter stating such shall be submitted to Terry Ryan, Director Parking immediately. Contractor shall maintain in stock all normal replacement parts for all Manufacturers of elevator equipment located in the Parking Department. At the Parking Department’s option, the successful bidder may be subject to a site visit from the Parking Department’s representative to verify this requirement. Parts not normally stocked, P.C. cards, etc., must be available within a 48-hour period.