Site 1: Bailey Bridge Middle School: The work proposed under this solicitation shall include, but is not limited to: Scope overview is to relocate the front office closer to the existing vestibule and exterior storefront wall and move the corridor back behind the new office. Removal of front office area includes: masonry, sheetrock and hollow metal framed glass walls, casework, ceilings, flooring, mechanical, sprinkler and electrical work. Construct new front office area and center corridor to include: walls, doors, frames, door hardware, flooring, carpentry, acoustical ceilings, casework, painting, mechanical, sprinkler and electrical work. Select door hardware, access control, data wiring by owner as noted on plans. All work to be completed per attached Bailey Bridge Drawings. Site 2: Swift Creek Middle School: The work proposed under this solicitation shall include, but is not limited to: Scope overview is to construct a vestibule in the existing front corridor to direct visitors into front office. Install two (2) new painted hollow metal frames glass walls, each with one (1) set of double doors. Modify both sides of the front counter to install two (2) double action gates (1 on each side) to clearly define staff and public areas. Minor flooring work in public waiting area. Relocate above ceiling mechanical VAV in existing corridor to accommodate new hollow metal wall framing. Minor electrical lighting work to support location of the new hollow metal walls. Select door hardware, access control, data wiring and sprinkler by owner as noted in plans. All work to be completed per attached Swift Creek Drawings.