Specifications include, but are not limited to: 1. Mobilization 1 LS 2. Erosion Control 1 LS 3. Quality Control Testing 1 LS 4. Traffic Control 1 LS 5. Construction Survey 1 LS 6. Pre-Construction Video 1 LS 7. Bypass Pumping 1 LS 8. Utility Investigation 20 HR 9. Remove Bituminous Concrete Pavement 2,530 SQ. YD. 10. Installation of 8" SDR-35 Sewer Line 1,320 LF 11. Installation of 10" SDR-35 Sewer Line 880 LF 12. Remove Manhole 1 EA 13. Install 48" Manhole 1 EA 14. Install 60" Manhole 1 EA 15. Pipe Lining of Existing 8" Sanitary Sewer Line 6,100 LF 16. Pipe Lining of Existing 10" Sanitary Sewer Line 360 LF 17. Install 8" Pipe by Pipe Bursting Existing 8” 240 LF 18. 48" Manhole Lining 26 EA 19. 60" Manhole Lining 5 EA 20. Install Concrete Collar 12 EA