a. The Contractor shall replace flooring from the 2nd set of entrance doors through the lobby going down the hall and in the restroom hall. The Contractor shall replace the floor with Shaw Style Name: inlet/Style # 0296V/Color Name: Refuge/Color # 26155. b. The Contractor shall remove all wallpaper throughout the lobby and halls. c. The Contractor shall prep and paint all walls using SW Pure White 7005 d. The Contractor shall prep and paint all wood trim and wood cove base using SW Ellie Gray 7650 e. The Contractor shall prep and paint all metal trim using SW Ellie Gray 7650 f. The Contractor shall prep and paint all doors (restroom, hall, and electrical doors) using SW Ellie Gray 7650 g. The Contractor shall remove paint from elevator doors, and clean and polish stainless steel. h. The Contractor shall remove paint from elevator frames, and clean and polish stainless steel. i. The Contractor shall replace all ceiling tiles to include brown tiles around hanging lights in the middle of the lobby (specifications attached)