Specifications include, but are not limited to: A. Work of the Contract includes the rehabilitation/repairs and improvements to resolve vault drainage issues of the Pittsburgh Water and Sewer Authority (PWSA) public water system meter vaults as required or directed. Each site is unique, so there are specific designs for each of the sites to improve the stormwater drainage and for preventing water from accumulating within the identified Meter/Valve pits. Improvements will require interior concrete vault cleaning, rehabilitation, and repair, and may individually include automatic dewatering systems using vault sumps, gravity drainage or automatic sump pumps with new electrical service connections. New castings and hatchways will be installed at select locations. B. There are fourteen (14) location work sites throughout the PWSA Water District. The work sites include areas within the City of Pittsburgh, Aspinwall, Fox Chapel, Sharpsburg, and Reserve Township. All are within Allegheny County Pennsylvania (PA). C. The fourteen (14) sites include seven (7) priority sites, as noted below, which will need completed prior to the scheduled completion date, and prior to work performed at non-priority locations...