Specifications include, but are not limited to: 1. Provide all materials, labor, tools, and equipment to install new Boilers at the Prairie Commons Branch library. 2. Contractor is responsible for all field measurements and the quality of the final fit of the install. 3. Contractor is responsible for all Permits and Inspections. 4. Haul off and dispose off-site all removed material. 5. All work shall be coordinated with the Library’s Manager of Building Systems. 6. Work may start as early as 6:00am Monday - Friday. 7. Library may be open to the public during demolition & construction. Contractor will provide safety barricades and signage as needed to ensure the safety of patrons and staff. 8. Provide labor to remove existing hot water boilers, tank, pumps, Hot water Coil and associated piping. 9. Boiler – Dual Copperfinn IIs to be replaced with Dual Lochinvar Knight XLs or approved equal. Include data and efficiency sheets. 10. Expansion Tank – New Floor mount ASME bladder-type expansion tank has been replaced. Verify Tank can be re-used with Boiler Update. Provide Alternate pricing if new expansion tank is required.